Integrated Asset & Fleet Command Center for PT. Ulima Nitra Tbk
Monitor equipment availability, site movement, fuel usage, maintenance, procurement, billing, HSE compliance, and asset value across mining contractor, rental equipment, construction, and oil & gas support operations.
Fleet Availability Snapshot
Total Equipment
0
↑ 4.2% vs last month
On Project
0
↑ 3.1% vs last month
Workshop Queue
0
↑ 2.3% needs action
Monthly Fuel Cost
Rp 245.6M
↑ 6.8% vs last month
Pending PR
0
↓ 10% improved
Asset Book Value
Rp 38.75B
↑ 5.6% YoY
Fuel Usage & Operational Cost
Trend pemakaian BBM, biaya, dan anomali efisiensi unit per bulan.
Asset Value & Depreciation
Nilai buku aset dan akumulasi penyusutan armada.
Procurement & Billing Workflow
Alur pembelian sparepart/material sampai penerimaan dan billing.
Purchase Request
18
Pending approval
Purchase Order
12
Confirmed
Goods Receive
9
Receiving
Invoicing
7
To invoice
Recent Equipment
Data unit, tag number, site, HM/KM, dan status.
| Unit | Tag No. | Site | HM / KM | Status |
|---|
Recent Documents
PR, PO, GR, rental/project order, dan invoice terakhir.
| Type | Doc No. | Vendor / Client | Date | Status |
|---|
Service Alerts 16
Unit mendekati service berkala by Hour Meter / KM.
Project Distribution
Distribusi unit aktif per area/site.
HSE & Compliance
Inspeksi unit, dokumen jatuh tempo, dan safety indicator.
Projects & Sites
Monitoring area kerja, pool, workshop, client site, unit aktif, dan utilisasi proyek.
Site Utilization
Perbandingan equipment availability, fuel cost, dan downtime per site.
Featured Unit Detail
Detail unit terpilih untuk validasi tag number, site, HM/KM, status, dokumen, dan nilai aset.
Unit Name
Komatsu PC200
Tag Number
UN-EXC-200-01
Current Site
Bosowa Mining
Hour Meter
12,450 HM
Book Value
Rp 1.84B
Next Service
550 HM left
Equipment Registry
Master data unit, kategori, tag number, lokasi, HM/KM, ownership, dan status operasional.
| Unit | Category | Tag No. | Site | HM / KM | Availability | Status |
|---|
Equipment Transfer / Site Movement
Kontrol mutasi aset antar pool, workshop, project site, dan PIC operasional.
Transfer Requests
Monitoring approval mutasi unit dan status mobilisasi.
| Transfer No. | Unit | From | To | PIC | Status |
|---|
Movement Timeline
Contoh timeline perpindahan unit.
Request Created
Site Bosowa meminta tambahan excavator.
Approved by Ops
Disetujui oleh Operation Manager.
Mobilization
Unit dalam proses pengiriman ke site tujuan.
Received at Site
Menunggu konfirmasi penerimaan unit.
Fuel & Daily Usage Monitoring
Pencatatan BBM harian, HM/KM awal-akhir, liter, biaya, dan efisiensi unit.
Daily Fuel
8,420 L
↑ 4.9% vs yesterday
Avg. Efficiency
19.8 L/HM
↓ 2.1% better
Fuel Anomaly
5 Units
Needs review today
Fuel by Site
Pemakaian solar per project/site.
Fuel Logs
Transaksi pengisian BBM terbaru.
| Date | Unit | Site | Liter | Cost | Status |
|---|
Maintenance & Workshop
Service berkala by HM/KM, breakdown, work order, sparepart usage, dan downtime.
Maintenance Cost Trend
Biaya service dan sparepart bulanan.
Workshop Queue
Unit yang sedang menunggu atau dalam perbaikan.
| WO No. | Unit | Issue | Downtime | Status |
|---|
HSE & Compliance
Inspection checklist, safety finding, permit expiry, dan kepatuhan operasional.
Daily Inspection
Checklist unit sebelum operasi harian.
Document Expiry
STNK, KIR, SIO, izin site, dan sertifikat alat.
Open Findings
Temuan safety yang perlu closing.
Incident Record
Monitoring incident dan near miss.